With a large sign of relief, we completed our final walk through of the project at Erie on the Park in Chicago’s River North. The priming and finish painting of the exterior steel beams was completed on budget, ahead of schedule. Advance scheduling and consistent communication allowed me to be prepared and made my job easier. The project was moved forward as quickly and safely as possible, keeping the inconvenience to the residents to a minimum throughout the four month process.
Although the task was challenging, all of the requirements of the paint process were fulfilled and the end result is a welcome upgrade. Given the unique design of our building, the mobilization was a tremendous obstacle as the number of scaffolding and swing stage changes was likely four times what a similar size structure would total. Without hesitation, I recommend Finishing Chicago professionals to handle your building’s facade, painting or restoration needs.